1. <ruby id="vapku"><i id="vapku"></i></ruby>
      <dd id="vapku"></dd>

              <optgroup id="vapku"><em id="vapku"><pre id="vapku"></pre></em></optgroup>
              <track id="vapku"><i id="vapku"></i></track>

              <track id="vapku"></track>
                  <span id="vapku"></span><ruby id="vapku"><table id="vapku"></table></ruby>

                  <optgroup id="vapku"></optgroup>
                1. Grooving Machine WH-150 

                  Grooving Machine WH-150

                  Grooving Machine WH-150

                  standard specs blade
                  Optional item
                  Get Best Price Chat with Messenger
                  Category:
                  Current Progress
                  Current Progress
                  Current Progress
                  Current Progress
                  Current Progress
                  Current Progress

                  Application:

                  VATOLE grooving machine is used to enlarge and clean the crack on the ground quickly(cement and asphalt road surface), which create the good condition for filling or sealing later. 

                  Features:

                  This machine is very convenient to start the machine working with advantages of flexible, light and smooth operation, which is very effectively to reduce the working force intensity.

                  Technical Data:

                  Grooving Machine Model

                  WH-150H

                  WH-150D

                  Engine

                  Honda GX390

                  Diesel Engine WH188F

                  Blade diameter

                  150/180

                  Blade thickness

                  8mm

                  Blade quantity

                  1 or 2

                  Shaft speed

                  3000r/min

                  Groove depth

                  0-40mm

                  Groove width

                  8-10mm/20mm

                  Cutting speed

                  2-4m/min

                  Operating size

                  920*630*890mm

                  Package size

                  940*650*910mm

                  Operating weight

                  75KG

                  Shipping weight

                  85KG

                  Operating mode

                  Manual operation

                  *Other engines are available as requested

                  *Features and specifications are subject to change without notification

                  Maintenance:

                  Engine Periodic Maintenance Schedule(REGULAR SERVICE PERIOD)

                  Performed at every indicated month or operation hours interval, whichever comes first.

                  Item

                  Directive

                  Each use

                  First month or 20 Hrs.

                  Every 3 months or 50 Hrs.

                  Every 6 months or 100 Hrs.

                  Every year or 300 Hrs.

                  Engine oil

                  Check level

                  Cell
                  Cell
                  Cell
                  Cell

                  Change

                  Cell

                  Cell

                  Cell

                  Air cleaner

                  Check

                  Cell
                  Cell
                  Cell
                  Cell

                  Clean

                  Cell
                  Cell

                  √(1)

                  Cell
                  Cell

                  Replace

                  Cell
                  Cell
                  Cell
                  Cell

                  √*

                  Sediment cup

                  Clean

                  Cell
                  Cell
                  Cell

                  Cell

                  Spark plug

                  Check-Clean

                  Cell
                  Cell
                  Cell

                  Cell

                  Replace

                  Cell
                  Cell
                  Cell
                  Cell

                  Idle speed

                  Check-Adjust

                  Cell
                  Cell
                  Cell
                  Cell

                  √(2)

                  Valve clearance

                  Check-Adjust

                  Cell
                  Cell
                  Cell
                  Cell

                  √(2)

                  Fuel rank and strainer

                  Clean

                  Cell
                  Cell
                  Cell
                  Cell

                  √(2)

                  Combustion chamber

                  Clean

                  After every 300 Hrs. (2)

                  Fuel line

                  Check

                  Every 2 years (Replace if necessary) (2)

                  * Replace the paper element type only.

                  (1) Service more frequently when used in dusty areas.

                  (2) These items should be serviced by your servicing dealer unless you have the proper tools and are mechanically proficient. Refer to manual for service procedures.

                  en_USEnglish
                  人人添人人澡人人澡人人人人_女人自熨全过程(有声)视频_欧美成人片高潮野外做片_丰满大尺寸老熟女视频